| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20014202 | Name of Scheme: Haria Khera W/S SCHEME | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 4301 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 31-Dec-2024 | Actual Date of Completion (Capex): 06-Nov-2023 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 30/72 | Haria Khera | 28.969889 | 77.45119 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE PUMP-15 HP | 570 | Haria Khera | 28.969889 | 77.45119 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 175/10 | Haria Khera | 28.969805 | 77.451091 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | K-7 | 100 | 0.040 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 90 | 0.2837 | |
| 2 | HDPE | 75 | 0.5814 | |
| 3 | HDPE | 63 | 6.2502 | |
| 4 | HDPE | 160 | 0.037 | |
| 5 | HDPE | 125 | 0.1811 | |
| 6 | HDPE | 110 | 0.7276 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 561 |