Scheme ID: 20014202 Name of Scheme: Haria Khera W/S SCHEME No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 4301 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 06-Nov-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 30/72 Haria Khera 28.969889 77.45119
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP-15 HP 570 Haria Khera 28.969889 77.45119
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 175/10 Haria Khera 28.969805 77.451091
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7 100 0.040
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 0.2837
2 HDPE 75 0.5814
3 HDPE 63 6.2502
4 HDPE 160 0.037
5 HDPE 125 0.1811
6 HDPE 110 0.7276
HSC Connection
Sno. Total Nos.
1 561
Other Details
2.04
2.04
2.08
06-Nov-2023
07-Nov-2023