| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20014240 | Name of Scheme: jagos w/s scheme | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 4979 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 31-Dec-2024 | Actual Date of Completion (Capex): 15-Mar-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 21 M / 71.4 M | JAGOSH | 29.128145 | 77.150477 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE PUMP-17.50HP | 630 | JAGOSH | 29.128145 | 77.150477 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 200KL/12 MTR | JAGOSH | 29.128141 | 77.150565 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | K7 | 150 | 0.038 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 90 | 0.8143 | |
| 2 | HDPE | 75 | 0.209 | |
| 3 | HDPE | 63 | 5.510 | |
| 4 | HDPE | 110 | 0.051 | |
| 5 | HDPE | 110 | 0.429 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |