| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20014495 | Name of Scheme: AGHARA PWS | No. of Villages: 2 | No. of Habitation Covered: 6 |
| Total Population Covered: 3900 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 08-May-2023 | Actual Date of Completion (Capex): 19-Dec-2022 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tube well | 27.05 mtr/ 94.26 mtr | AGHARA | 26.709599* | 79.543846* |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | 54(M3/Hr.)/47Mtr. | AGHARA | 26.709599 | 79.543846* |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 250/17 | AGHARA | 26.701047* | 79.550747* |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | D.I. | 150 | 17.50 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 6179 | |
| 2 | HDPE | 75 | 102 | |
| 3 | HDPE | 90 | 164 | |
| 4 | HDPE | 110 | 178 | |
| 5 | HDPE | 140 | 683 | |
| 6 | HDPE | 160 | 1038 | |
| 7 | HDPE | 180 | 593 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 725 |