| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20014518 | Name of Scheme: bhadaurpur sahar pws | No. of Villages: 2 | No. of Habitation Covered: 4 |
| Total Population Covered: 2200 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 08-May-2023 | Actual Date of Completion (Capex): 21-Aug-2023 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tube well | 20.05Mtr. /83.18Mtr. | bhadaurpur sahar | 26.752514* | 79.55648* |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | 31.6(M3/Hr.)/47Mtr. | bhadaurpur sahar | 26.752514* | 79.55648* |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 175/16 | bhadaurpur sahar | 26.752648* | 79.55648* |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | D.I | 150 | 12 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 5483.00 | |
| 2 | HDPE | 75 | 442 | |
| 3 | HDPE | 140 | 2376.50 | |
| 4 | HDPE | 160 | 56 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 502 |