Project Completion Certificate (Ground Water)
Scheme ID: 20014518 Name of Scheme: bhadaurpur sahar pws No. of Villages: 2 No. of Habitation Covered: 4
Total Population Covered: 2200 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 08-May-2023 Actual Date of Completion (Capex): 21-Aug-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well 20.05Mtr. /83.18Mtr. bhadaurpur sahar 26.752514* 79.55648*
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 31.6(M3/Hr.)/47Mtr. bhadaurpur sahar 26.752514* 79.55648*
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 175/16 bhadaurpur sahar 26.752648* 79.55648*
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I 150 12
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 5483.00
2 HDPE 75 442
3 HDPE 140 2376.50
4 HDPE 160 56
HSC Connection
Sno. Total Nos.
1 502
Other Details
1.81
2.04
2.04
04-Feb-2024
05-Feb-2024