Project Completion Certificate (Ground Water)
Scheme ID: 20014526 Name of Scheme: ariyari No. of Villages: 4 No. of Habitation Covered: 4
Total Population Covered: 2900 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 08-May-2023 Actual Date of Completion (Capex): 01-Jul-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 21.00 Mtr./ 115.02 Mtr. Ariyari 26.692579 79.567235
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible (50.6 M3/Hr.) / 47 Mtr. Ariyari 26.692579 79.567235
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 175 Kl/ 16 Mtr. Ariyari 26.784866 79.544323
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. 150 0.009
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 5.41
2 HDPE 75 0.342
3 HDPE 90 0.106
4 HDPE 110 0.74
5 HDPE 140 0.837
6 HDPE 160 3.777
HSC Connection
Sno. Total Nos.
1 472
Other Details
2.10
2.33
2.33
09-Oct-2023
10-Oct-2023