Project Completion Certificate (Ground Water)
Scheme ID: 20014533 Name of Scheme: narttampur pws No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 1810 Base Year: 2022 Intermediate Year: 2032 Design Year: 2052
Date of Completion (As per Contract): 08-May-2023 Actual Date of Completion (Capex): 10-Apr-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube Well 21.1 Mtr./114.49 Mtr. NAROTTAMPUR 26.481698 79.513987
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible (30.4 M3/Hr.)/49 Mtr. NAROTTAMPUR 26.481698 79.513987
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 150/12 NAROTTAMPUR 26.481624 79.513869
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. 150 .013
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 3.70
2 HDPE 75 .164
3 HDPE 90 .539
4 HDPE 140 .105
HSC Connection
Sno. Total Nos.
1 410
Other Details
1.36
1.76
1.76
19-Jul-2025
20-Jul-2025