Project Completion Certificate (Ground Water)
Scheme ID: 20014576 Name of Scheme: GADAURA GRAMIN PEYJAL YOJNA No. of Villages: 2 No. of Habitation Covered: 3
Total Population Covered: 2389 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 06-Jan-2024 Actual Date of Completion (Capex): 29-Oct-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 150 MM DIA SLOTTED PIPE 15.06 GADAURA 27.009886 79.689725
2 150 MM DIA PLAIN PIPE 18.13 GADAURA 27.009886 79.689725
3 200 MM DIA SLOTTED PIPE 6.01 GADAURA 27.009886 79.689725
4 200 MM PLAIN PIPE 56.08 GADAURA 27.009886 79.689725
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 526/63 GADAURA 27.009886 79.689725
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC 150/12 GADAURA 27.009886 79.689725
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 .088
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 4.188
2 HDPE 75 .507
3 HDPE 90 .426
4 HDPE 110 .337
5 HDPE 125 .648
6 HDPE 160 1.508
7 HDPE 180 .155
HSC Connection
Sno. Total Nos.
1 449
Other Details
2.43
0.00
1.56
28-Oct-2024
30-Oct-2024