| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20014587 | Name of Scheme: BAKHARIYA PWS | No. of Villages: 1 | No. of Habitation Covered: 2 |
| Total Population Covered: 1840 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 08-May-2023 | Actual Date of Completion (Capex): 10-Jan-2023 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBE WELL | 21.0 Mtr/124.55 Mtr | BAKHARIYA | 26.522305 | 79.426807 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE | (31.2 M3/Hr.)/53Mtr. | BAKHARIYA | 26.522305 | 79.426807 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 150/16 | BAKHARIYA | 26.522401 | 79.426766 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | D.I | 100 | 0.016 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 4.48 | |
| 2 | HDPE | 75 | .35 | |
| 3 | HDPE | 90 | .79 | |
| 4 | HDPE | 110 | .16 | |
| 5 | HDPE | 140 | .26 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 457 |