| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20014702 | Name of Scheme: Majhila | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 4190 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 31-Dec-2024 | Actual Date of Completion (Capex): 20-Dec-2023 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 24.07/102.44 | MAJHILA | 28.133675 | 79.765056 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | VP PUMP -1 | 51.60/45 | MAJHILA | 28.133675 | 79.765056 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT -1 | 300/16 | MAJHILA | 28.133664 | 79.765114 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | K-7 | 150 | 0.0295 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE / 6KG | 63 | 5.410 | |
| 2 | HDPE / 6KG | 75 | 0.690 | |
| 3 | HDPE / 6KG | 90 | 0.277 | |
| 4 | HDPE / 6KG | 110 | 0.407 | |
| 5 | HDPE / 6KG | 140 | 0.276 | |
| 6 | HDPE / 6KG | 180 | 0.387 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |