Project Completion Certificate (Ground Water)
Scheme ID: 20014725 Name of Scheme: JIHURA MAFI TEJWAPUR PWS No. of Villages: 1 No. of Habitation Covered: 9
Total Population Covered: 8236 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 30-Jun-2025 Actual Date of Completion (Capex): 07-Mar-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 26.05/265.03 JIHURA MAFI 27.453779 81.464634
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT Pump-1 1050 LPM/35 Mtr JIHURA MAFI 27.453779 81.464634
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 300 KL/12 Mtr JIHURA MAFI 27.453784 81.464539
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI-K7 150 0.036
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6; Class PE-100 63 4.898
2 HDPE Pipe PN-6; Class PE-100 75 1.859
3 HDPE Pipe PN-6; Class PE-100 90 2.531
4 HDPE Pipe PN-6; Class PE-100 110 0.320
5 HDPE Pipe PN-6; Class PE-100 140 1.664
6 HDPE Pipe PN-6; Class PE-100 160 1.615
HSC Connection
Sno. Total Nos.
1 674
Other Details
2.94
2.81
2.59
23-Jun-2024
08-Mar-2025