Project Completion Certificate (Ground Water)
Scheme ID: 20014796 Name of Scheme: CHAK BAKAINIYA No. of Villages: 4 No. of Habitation Covered: 4
Total Population Covered: 2117 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 30-Sep-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 21.05/85.41 CHAK BAKAINIYA 28.212088 79.85759
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT PUMP-1 24.48M3/45M CHAK BAKAINIYA 28.212088 79.85759
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 150KL-16M CHAK BAKAINIYA 28.212065 79.85769
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI - K7 100 0.030
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE/6KG 63 4.937
2 HDPE/6KG 75 0.015
3 HDPE/6KG 110 1.197
4 HDPE/6KG 140 1.593
HSC Connection
Sno. Total Nos.
1 541
Other Details
2.20
0.00
2.20
30-Dec-2023
06-Dec-2024