| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20014808 | Name of Scheme: Khandsar | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 2900 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 22-Jul-2023 | Actual Date of Completion (Capex): 31-Dec-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 42.12/90.65 | KHANDSAR | 27.980251 | 79.638195 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | VT PUMP -1 | 25.2 /43 | KHANDSAR | 27.980251 | 79.638195 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 200/12 | KHANDSAR | 27.982336 | 79.638029 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | K-7 | 125 | 0.027 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE / 6KG | 63 | 4.586 | |
| 2 | HDPE / 6KG | 75 | 0.584 | |
| 3 | HDPE / 6KG | 90 | 0.868 | |
| 4 | HDPE / 6KG | 110 | 0.580 | |
| 5 | HDPE / 6KG | 140 | 0.080 | |
| 6 | HDPE / 6KG | 160 | 0.157 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 615 |