| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20014817 | Name of Scheme: PALIYA PATTI | No. of Villages: 2 | No. of Habitation Covered: 2 |
| Total Population Covered: 2159 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 01-Dec-2023 | Actual Date of Completion (Capex): 31-Dec-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 18/80.17 | PALIYA PATTI | 27.957124 | 79.630033 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | VT PUMP -1 | 28.80/45 | PALIYA PATTI | 27.957124 | 79.630033 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT -1 | 150/16 | PALIYA PATTI | 27.959657 | 79.630063 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI - K7 | 100 | 0.029 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE / 6KG | 63 | 4.954 | |
| 2 | HDPE / 6KG | 75 | 0.449 | |
| 3 | HDPE / 6KG | 90 | 0.656 | |
| 4 | HDPE / 6KG | 110 | 0.370 | |
| 5 | HDPE / 6KG | 140 | 0.695 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 397 |