| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20014861 | Name of Scheme: GURA PWS | No. of Villages: 2 | No. of Habitation Covered: 6 |
| Total Population Covered: 1750 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 08-May-2023 | Actual Date of Completion (Capex): 01-Aug-2023 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tube well | 15.03 Mtr./117.84 Mtr. | GURA | 26.860452* | 79.506805* |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | 33.96(M3/Hr.)/46Mtr. | GURA | 26.860452* | 79.506805* |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 100/16 | GURA | 26.861843* | 79.504308* |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | D.I. | 100 | 33.25 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 4534.00 | |
| 2 | HDPE | 75 | 166.00 | |
| 3 | HDPE | 90 | 504.00 | |
| 4 | HDPE | 110 | 435.00 | |
| 5 | HDPE | 140 | 735.00 | |
| 6 | HDPE | 160 | 261 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 300 |