Project Completion Certificate (Ground Water)
Scheme ID: 20014862 Name of Scheme: Kaba PWS No. of Villages: 2 No. of Habitation Covered: 4
Total Population Covered: 1950 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 08-May-2023 Actual Date of Completion (Capex): 26-Jul-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 21.07mtr/90.01mtr Kaba 26.858056 79.452805
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 30.07/43 Kaba 26.858056 79.452805
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Oht 150/12 Kaba 26.8587752 79.4522368
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 Di 100 11.50
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 5925.1
2 HDPE 75 319.20
3 HDPE 90 1617
4 HDPE 110 416.20
5 HDPE 140 58.00
HSC Connection
Sno. Total Nos.
1 450
Other Details
1.55
1.71
1.71
09-Nov-2023
10-Nov-2023