Project Completion Certificate (Ground Water)
Scheme ID: 20014863 Name of Scheme: SARAI KACHHWAH PWS No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 2050 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 08-May-2023 Actual Date of Completion (Capex): 04-Aug-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 24.12 M / 112.07 M Sarai Kachhwah 26.843839 79.447148
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible (27.30 M3/Hr.) / 43 M Sarai Kachhwah 26.843839 79.447148
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 150 KL / 12.0 M Sarai Kachhwah 26.843812 79.447301
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. 100 0.028
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 3.748
2 HDPE 75 0.423
3 HDPE 90 0.858
4 HDPE 110 0.271
5 HDPE 140 0.089
HSC Connection
Sno. Total Nos.
1 391
Other Details
1.53
1.58
1.58
09-Nov-2023
10-Nov-2023