Project Completion Certificate (Ground Water)
Scheme ID: 20014864 Name of Scheme: bhatoli pws No. of Villages: 1 No. of Habitation Covered: 5
Total Population Covered: 3420 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 08-May-2023 Actual Date of Completion (Capex): 26-Dec-2022
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube Well 21.74 Mtr./72.76 Mtr. Bhatoli 26.846504 79.473596
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible (48.87 M3/Hr.)/46Mtr. Bhatoli 26.846504 79.473596
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 200/16 Bhatoli 26.845597 79.473252
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. 100 .017
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 6.95
2 HDPE 75 1.02
3 HDPE 90 1.42
4 HDPE 110 1.03
5 HDPE 140 .64
6 HDPE 160 .81
HSC Connection
Sno. Total Nos.
1 587
Other Details
1.93
1.99
1.99
09-Apr-2023
10-Apr-2023