Scheme ID: 20015029 Name of Scheme: Kiratpur No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 2530 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 12-Sep-2022 Actual Date of Completion (Capex): 10-Nov-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 3.93
2 HDPE 110 1.06
3 HDPE 160 0.053
4 HDPE 180 0.55
HSC Connection
Sno. Total Nos.
Other Details
1.71
2.03
2.03
20-Apr-2024