Scheme ID: 20015030 Name of Scheme: Phoolpur No. of Villages: 1 No. of Habitation Covered: 3
Total Population Covered: 1790 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 12-Oct-2022 Actual Date of Completion (Capex): 14-Apr-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube Well 24.09/150.9 Phoolpur 26.848324 79.011353
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 27(M³/Hr.)/27Mtr. Phoolpur 26.848324 79.011353
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 150/12 Phoolpur 26.848324 79.011353
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I 80 0.021
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 2.594
2 HDPE 75 1.824
3 HDPE 90 1.469
4 HDPE 110 1.758
HSC Connection
Sno. Total Nos.
1 316
Other Details