| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20015031 | Name of Scheme: Saidpur | No. of Villages: 2 | No. of Habitation Covered: 5 |
| Total Population Covered: 2250 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 12-Oct-2022 | Actual Date of Completion (Capex): 14-Jan-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tube Well | 30.10/160.65 | Saidpur | 26.749286 | 79.204764 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | 30.01(M³/Hr.)/41Mtr. | Saidpur | 26.749286 | 79.204764 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 150/12 | Saidpur | 26.749286 | 79.204764 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | D.I. | 80 | 206.50 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 3.003 | |
| 2 | HDPE | 75 | 0.892 | |
| 3 | HDPE | 90 | 0.496 | |
| 4 | HDPE | 110 | 0.135 | |
| 5 | HDPE | 140 | 0.091 | |
| 6 | HDPE | 160 | 1.330 | |
| 7 | HDPE | 180 | 1.371 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 400 |