| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20015033 | Name of Scheme: Beedhupura | No. of Villages: 4 | No. of Habitation Covered: 6 |
| Total Population Covered: 2350 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 08-May-2023 | Actual Date of Completion (Capex): 11-Aug-2023 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 3631.80 | |
| 2 | HDPE | 75 | 1736 | |
| 3 | HDPE | 90 | 1337 | |
| 4 | HDPE | 110 | 1190 | |
| 5 | HDPE | 140 | 1223 | |
| 6 | HDPE | 160 | 940 | |
| 7 | HDPE | 180 | 839 | |
| 8 | HDPE | 200 | 326 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |