Project Completion Certificate (Ground Water)
Scheme ID: 20015039 Name of Scheme: Sarekhipura No. of Villages: 1 No. of Habitation Covered: 3
Total Population Covered: 2130 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 08-May-2023 Actual Date of Completion (Capex): 03-Nov-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 2896
2 HDPE 75 2647
3 HDPE 90 1245.70
4 HDPE 110 878
5 HDPE 140 712.50
6 HDPE 160 215
7 HDPE 180 108.5
HSC Connection
Sno. Total Nos.
Other Details
1.74
2.05
2.05
26-Mar-2024
25-Jun-2024