Project Completion Certificate (Ground Water)
Scheme ID: 20015055 Name of Scheme: Un Kalan Nigohi W/s No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 5270 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 04-Jan-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 36.05/94.09 UN KALAN 28.170457 79.829825
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT PUMP -1 67.22M3/45M UN KALAN 28.170457 79.829825
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 325KL-16M UN KALAN 28.170495 79.829868
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI -K7 200 0.030
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE/6KG 63 6.970
2 HDPE/6KG 75 0.492
3 HDPE/6KG 90 0.616
4 HDPE/6KG 110 0.503
5 HDPE/6KG 140 0.580
6 HDPE/6KG 200 0.207
HSC Connection
Sno. Total Nos.
1 1090
Other Details
3.47
0.00
3.47
04-Apr-2024
06-Dec-2024