| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20015102 | Name of Scheme: NADIAYA RAMPUR Jatipur W/s | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 2210 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 30-Sep-2023 | Actual Date of Completion (Capex): 31-Dec-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 21.06/96.24 | NADIAYA RAMPUR | 28.036562 | 79.592960 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | VP PUMP -1 | 29.52/43 | NADIAYA RAMPUR | 28.036562 | 79.592960 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT -1 | 150/12 | NADIAYA RAMPUR | 28.036663 | 79.593005 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | K-7 | 125 | 0.029 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE / 6KG | 63 | 3.251 | |
| 2 | HDPE / 6KG | 75 | 0.365 | |
| 3 | HDPE / 6KG | 90 | 0.471 | |
| 4 | HDPE / 6KG | 110 | 0.325 | |
| 5 | HDPE / 6KG | 140 | 0.039 | |
| 6 | HDPE / 6KG | 160 | 0.035 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 357 |