Project Completion Certificate (Ground Water)
Scheme ID: 20015137 Name of Scheme: NARIHA No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 3825 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 13-Oct-2021 Actual Date of Completion (Capex): 12-Oct-2020
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 1955.60
2 HDPE 75 1631.20
3 HDPE 90 1925.10
4 HDPE 110 2978.50
5 HDPE 140 1297.60
6 HDPE 160 619.40
7 HDPE 180 314
HSC Connection
Sno. Total Nos.
Other Details
2.65
2.81
2.81
31-Mar-2024
01-Apr-2024