| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20015269 | Name of Scheme: PIDHI WATER SUPPLY SCHEME | No. of Villages: 1 | No. of Habitation Covered: 9 |
| Total Population Covered: 3650 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 03-Mar-2026 | Actual Date of Completion (Capex): 31-May-2026 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 25.13/88.67 | Pidhi | 26.34075006 | 82.25254078 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | VT Pump -1 | 650 LPM / 45 M | Pidhi | 26.34075006 | 82.25254078 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 175 KL / 16 M | Pidhi | 26.34075006 | 82.25254078 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI / K9 | 125 | 0.0300 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 90 | 1.179 | |
| 2 | HDPE | 75 | 2.880 | |
| 3 | HDPE | 63 | 9.519 | |
| 4 | HDPE | 160 | 0.650 | |
| 5 | HDPE | 140 | 1.996 | |
| 6 | HDPE | 125 | 2.256 | |
| 7 | HDPE | 110 | 4.000 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 598 |