| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20015311 | Name of Scheme: ETAURA DADROL w/s | No. of Villages: 1 | No. of Habitation Covered: 2 |
| Total Population Covered: 2140 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 31-Aug-2023 | Actual Date of Completion (Capex): 31-Dec-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELLS WITH SOLAR PLANT | 18.01/74.04 | ETAURA | 27.711587 | 79.882116 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE PUMP | 460/41 | ETAURA | 27.711587 | 79.882116 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | RCC STRUCTURE WITH ZINCALUME WATER TANK | 150 KL / 12Mtr | ETAURA | 27.711715 | 79.882063 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI - K7 | 100 | 0.030 | RISING MAINS |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE / 6Kg | 63 | 2.268 | Distribution Network |
| 2 | HDPE / 6Kg | 75 | 0.577 | Distribution Network |
| 3 | HDPE / 6Kg | 90 | 0.168 | Distribution Network |
| 4 | HDPE / 6Kg | 110 | 0.364 | Distribution Network |
| 5 | HDPE / 6Kg | 140 | 1.000 | Distribution Network |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 378 |