Project Completion Certificate (Ground Water)
Scheme ID: 20015311 Name of Scheme: ETAURA DADROL w/s No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 2140 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Aug-2023 Actual Date of Completion (Capex): 31-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELLS WITH SOLAR PLANT 18.01/74.04 ETAURA 27.711587 79.882116
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 460/41 ETAURA 27.711587 79.882116
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC STRUCTURE WITH ZINCALUME WATER TANK 150 KL / 12Mtr ETAURA 27.711715 79.882063
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI - K7 100 0.030 RISING MAINS
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE / 6Kg 63 2.268 Distribution Network
2 HDPE / 6Kg 75 0.577 Distribution Network
3 HDPE / 6Kg 90 0.168 Distribution Network
4 HDPE / 6Kg 110 0.364 Distribution Network
5 HDPE / 6Kg 140 1.000 Distribution Network
HSC Connection
Sno. Total Nos.
1 378
Other Details
1.97
2.08
2.06
30-Nov-2023
16-Nov-2024