Project Completion Certificate (Ground Water)
Scheme ID: 20015328 Name of Scheme: AKARA PWS No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 1849 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 30-Sep-2023 Actual Date of Completion (Capex): 30-Jun-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Akara TWS 146.21 Akara 27.6574 81.7838
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 0.42 / 39 Akara 27.6574 81.7838
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Over Head Tank 125 / 12 Akara 27.6574 27.6574
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 30
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 2.66
2 HDPE 75 1.10
3 HDPE 90 0.444
4 HDPE 110 0.290
5 HDPE 140 1.038
6 HDPE 160 0.133
HSC Connection
Sno. Total Nos.
1 370
Other Details
169.10
165.59
176.71
30-Sep-2023
01-Oct-2023