| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20015362 | Name of Scheme: Ram Khera WSS | No. of Villages: 2 | No. of Habitation Covered: 2 |
| Total Population Covered: 2600 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 31-Dec-2024 | Actual Date of Completion (Capex): 15-May-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 24.05/90.26 | RAM KHERA | 27.659398 | 79.818343 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | VT PUMP -1 | 27.60 M3/41M | RAM KHERA | 27.659398 | 79.818343 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT - 1 | 150 KL - 12M | RAM KHERA | 27.659517 | 79.818406 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI - K7 | 100 | 0.030 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE/6KG | 63 | 5.075 | |
| 2 | HDPE/6KG | 75 | 0.345 | |
| 3 | HDPE/6KG | 90 | 0.315 | |
| 4 | HDPE/6KG | 110 | 1.033 | |
| 5 | HDPE/6KG | 140 | 0.037 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 432 |