Project Completion Certificate (Ground Water)
Scheme ID: 20015542 Name of Scheme: Miyuna sww No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 2960 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 04-Jan-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 30.05/97.37 MIYUNA 28.132593 79.707735
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VP PUMP -1 38.88/45 MIYUNA 28.132593 79.707735
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT -1 200/16 MIYUNA 28.132463 79.707761
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7 125 0.030
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE / 6KG 63 4.159
2 HDPE / 6KG 75 0.871
3 HDPE / 6KG 90 0.349
4 HDPE / 6KG 110 1.604
5 HDPE / 6KG 140 1.419
6 HDPE / 6KG 160 0.039
HSC Connection
Sno. Total Nos.
1 508
Other Details
2.23
0.00
2.23
04-Apr-2024
06-Dec-2024