| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20015542 | Name of Scheme: Miyuna sww | No. of Villages: 1 | No. of Habitation Covered: 2 |
| Total Population Covered: 2960 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 31-Dec-2024 | Actual Date of Completion (Capex): 04-Jan-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 30.05/97.37 | MIYUNA | 28.132593 | 79.707735 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | VP PUMP -1 | 38.88/45 | MIYUNA | 28.132593 | 79.707735 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT -1 | 200/16 | MIYUNA | 28.132463 | 79.707761 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | K-7 | 125 | 0.030 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE / 6KG | 63 | 4.159 | |
| 2 | HDPE / 6KG | 75 | 0.871 | |
| 3 | HDPE / 6KG | 90 | 0.349 | |
| 4 | HDPE / 6KG | 110 | 1.604 | |
| 5 | HDPE / 6KG | 140 | 1.419 | |
| 6 | HDPE / 6KG | 160 | 0.039 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 508 |