Project Completion Certificate (Ground Water)
Scheme ID: 20015547 Name of Scheme: Garhia Sareli No. of Villages: 2 No. of Habitation Covered: 3
Total Population Covered: 3110 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 31-Aug-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 30.05/90.42 GARHIA SARELI 28.210732 80.284574
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT PUMP -1 39.96M3/45M GARHIA SARELI 28.210732 80.284574
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT - 1 200 KL - 16 M GARHIA SARELI 28.210728 80.284565
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI - K7 125 0.030
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE/6KG 63 7.235
2 HDPE/6KG 75 0.110
3 HDPE/6KG 90 0.526
4 HDPE/6KG 110 0.650
5 HDPE/6KG 200 1.308
HSC Connection
Sno. Total Nos.
1 609
Other Details
2.65
0.00
2.65
30-Nov-2023
06-Dec-2024