Project Completion Certificate (Ground Water)
Scheme ID: 20015639 Name of Scheme: Nawada j Palia No. of Villages: 3 No. of Habitation Covered: 3
Total Population Covered: 2167 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 23-Jun-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 24.00/76.46 NAWADA J. PALIA 28.080211 79.717026
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VP PUMP -1 29.16 M3 / 45 M NAWADA J. PALIA 28.080211 79.717026
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT -1 150 KL-16 M NAWADA J. PALIA 28.080251 79.717038
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7 100 0.030
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE / 6Kg 63 4.108
2 HDPE / 6Kg 75 0.519
3 HDPE / 6Kg 90 1.278
4 HDPE / 6Kg 110 0.204
5 HDPE / 6Kg 140 0.219
HSC Connection
Sno. Total Nos.
1 443
Other Details
2.01
0.00
1.86
22-Sep-2024
06-Dec-2024