| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20015647 | Name of Scheme: kathpura | No. of Villages: 3 | No. of Habitation Covered: 3 |
| Total Population Covered: 1820 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 04-Jan-2024 | Actual Date of Completion (Capex): 31-Dec-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 14.03/68.45 | KATHPURA | 28.005488 | 79.960568 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | VT PUMP 1 | 21.96/45 | KATHPURA | 28.005488 | 79.960568 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT 1 | 100/16 | KATHPURA | 28.005524 | 79.960416 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI -K7 | 100 | 0.0295 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE / 6KG | 63 | 6.850 | |
| 2 | HDPE / 6KG | 75 | 0.736 | |
| 3 | HDPE / 6KG | 90 | 1.022 | |
| 4 | HDPE / 6KG | 110 | 0.970 | |
| 5 | HDPE / 6KG | 140 | 0.120 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 320 |