Project Completion Certificate (Ground Water)
Scheme ID: 20015680 Name of Scheme: UMRAHA No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2730 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 09-Jan-2024 Actual Date of Completion (Capex): 31-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 22/102.20 UMRAHA 27.765603 79.773448
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT PUMP 1 36/43 UMRAHA 27.765603 79.773448
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 1 175/12 UMRAHA 27.765803 79.773477
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7 125 0.028
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE / 6KG 63 2.795
2 HDPE / 6KG 75 0.215
3 HDPE / 6KG 90 0.075
4 HDPE / 6KG 110 0.240
5 HDPE / 6KG 140 0.210
6 HDPE / 6KG 180 0.250
HSC Connection
Sno. Total Nos.
1 463
Other Details
1.80
0.00
1.80
09-Apr-2024
06-Dec-2024