Project Completion Certificate (Ground Water)
Scheme ID: 20015760 Name of Scheme: Astoli No. of Villages: 1 No. of Habitation Covered: 3
Total Population Covered: 3390 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Aug-2023 Actual Date of Completion (Capex): 31-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 28.04/101.37 Astoli 27.758330 79.484765
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT Pump-1 34.2 M3/47M Astoli 27.758330 79.484765
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC STRUCTURE WITH ZINCALUME WATER TANK 175 / 16 ASTOLI 27.758220 79.484898
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI-K7 125 0.030
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE/6KG 63 6.050
2 HDPE/6KG 75 0.850
3 HDPE/6KG 90 0.475
4 HDPE/6KG 110 0.275
5 HDPE/6KG 140 0.215
6 HDPE/6KG 160 0.150
HSC Connection
Sno. Total Nos.
1 477
Other Details
2.24
0.00
2.22
30-Nov-2023
06-Dec-2024