| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20015834 | Name of Scheme: Jamdra gp water supply Scheme | No. of Villages: 3 | No. of Habitation Covered: 9 |
| Total Population Covered: 3152 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 03-Aug-2023 | Actual Date of Completion (Capex): 02-Apr-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Depth of Plain Pipe (m) | 71.9 | TW | 26.132899 | 83.089762 |
| 2 | Depth of Strainer (m) | 21 | TW | 26.132899 | 83.089762 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible pump | 700/46 | TW | 26.132899 | 83.089762 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | RCC Tank | 200/12 | OHT | 26.132899 | 83.089762 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI k-7 | 125 | 50 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 13.87 | |
| 2 | HDPE | 75 | 1.23 | |
| 3 | HDPE | 90 | 0.78 | |
| 4 | HDPE | 110 | 0.7 | |
| 5 | HDPE | 140 | 0.25 | |
| 6 | HDPE | 160 | 0.1 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 473 |