Project Completion Certificate (Ground Water)
Scheme ID: 20015849 Name of Scheme: Vannapur No. of Villages: 1 No. of Habitation Covered: 3
Total Population Covered: 3640 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 05-Mar-2023 Actual Date of Completion (Capex): 26-Mar-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewells 21.09 Mtr/ 69.27 Mtr Vannapur 27.188636 80.228142
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 0.8 M³ per Min /45Mtr Vannapur 27.188636 80.228142
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 225KL/ 16Mtr Vannapur 27.18856 80.228157
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. Pipe 150 0.0221
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6, Class PE-100 63 4.079
2 HDPE Pipe PN-6, Class PE-100 75 2.273
3 HDPE Pipe PN-6, Class PE-100 90 2.218
4 HDPE Pipe PN-6, Class PE-100 110 2.530
5 HDPE Pipe PN-6, Class PE-100 125 0.725
6 HDPE Pipe PN-6, Class PE-100 140 0.844
7 HDPE Pipe PN-6, Class PE-100 160 1.341
8 HDPE Pipe PN-6, Class PE-100 180 0.643
HSC Connection
Sno. Total Nos.
1 435
Other Details
3.54
0.00
3.08
25-Jun-2023
25-Dec-2024