| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20015880 | Name of Scheme: Barnai | No. of Villages: 2 | No. of Habitation Covered: 3 |
| Total Population Covered: 3340 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 31-Dec-2024 | Actual Date of Completion (Capex): 19-Mar-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 22.5/85.31 | BARNAI | 27.87082 | 79.96901 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | VT Pump - 1 | 43.2 M3 / 41 M | BARNAI | 27.87082 | 79.96901 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT - 1 | 225 KL - 12 M | BARNAI | 27.87015 | 79.96929 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI - K 7 | 150 | 0.028 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE / 6Kg | 63 | 4.239 | |
| 2 | HDPE / 6Kg | 75 | 0.465 | |
| 3 | HDPE / 6Kg | 90 | 1.125 | |
| 4 | HDPE / 6Kg | 110 | 0.192 | |
| 5 | HDPE / 6Kg | 140 | 1.238 | |
| 6 | HDPE / 6Kg | 160 | 0.180 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 619 |