Project Completion Certificate (Ground Water)
Scheme ID: 20015883 Name of Scheme: Tiulak No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 2820 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 14-Jul-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 29.95/88.22 TIULAK 27.915888 79.952912
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT PUMP -1 37.20M3/45M TIULAK 27.915888 79.952912
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 175KL-16M TIULAK 27.915942 79.954059
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI-K7 125 0.0295
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE/6KG 63 4.450
2 HDPE/6KG 75 0.873
3 HDPE/6KG 90 1.033
4 HDPE/6KG 110 0.440
5 HDPE/6KG 140 0.293
6 HDPE/6KG 160 0.170
HSC Connection
Sno. Total Nos.
1 463
Other Details
2.17
0.00
2.17
13-Oct-2024
06-Dec-2024