| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20015940 | Name of Scheme: munavwar ganj urf barenda WSS | No. of Villages: 1 | No. of Habitation Covered: 4 |
| Total Population Covered: 4620 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 30-Sep-2023 | Actual Date of Completion (Capex): 31-Dec-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELLS WITH SOLAR PLANT | 36.31 / 91.63 | munavwar ganj urf barenda | 27.753892 | 79.740965 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE PUMP | 970 / 45 | munavwar ganj urf barenda | 27.753892 | 79.740965 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | RCC STRUCTURE WITH ZINCALUME WATER TANK | 300 / 16 | munavwar ganj urf barenda | 27.753990 | 79.741059 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI K-7 | 150 | 0.030 | Rising Main |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 927 |