Project Completion Certificate (Ground Water)
Scheme ID: 20015959 Name of Scheme: CHAANDA WSS No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 3180 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 24-Dec-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 30.04/84.32 CHAANDA 27.995551 80.058770
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT PUMP -1 41.76M3/43M CHAANDA 27.995551 80.058770
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT -1 200KL-12M CHAANDA 27.995627 80.058809
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI - K7 125 0.030
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE/6KG 63 4.881
2 HDPE/6KG 75 0.487
3 HDPE/6KG 90 0.249
4 HDPE/6KG 110 0.769
5 HDPE/6KG 140 0.165
6 HDPE/6KG 160 0.185
HSC Connection
Sno. Total Nos.
1 500
Other Details
2.32
0.00
2.31
24-Mar-2024
06-Dec-2024