| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20016027 | Name of Scheme: Hingmala Urf Bhawsi | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 2028 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 16-Feb-2023 | Actual Date of Completion (Capex): 04-Mar-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 30.09 M / 94.93 M | HINGMALA URF BHAWSI | 28.491764 | 77.938302 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUMERSIBLE | 450 LPM / 46.60 M | HINGMALA URF BHAWSI | 28.491764 | 77.938302 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 150 KL / 12 M | HINGMALA URF BHAWSI | 28.491730 | 77.938174 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 100 | 0.0121 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 5.198 | |
| 2 | HDPE | 75 | 0.320 | |
| 3 | HDPE | 90 | 0.441 | |
| 4 | HDPE | 110 | 0.115 | |
| 5 | HDPE | 140 | 0.141 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 376 |