Project Completion Certificate (Ground Water)
Scheme ID: 20016027 Name of Scheme: Hingmala Urf Bhawsi No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2028 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 16-Feb-2023 Actual Date of Completion (Capex): 04-Mar-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 30.09 M / 94.93 M HINGMALA URF BHAWSI 28.491764 77.938302
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUMERSIBLE 450 LPM / 46.60 M HINGMALA URF BHAWSI 28.491764 77.938302
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 150 KL / 12 M HINGMALA URF BHAWSI 28.491730 77.938174
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.0121
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 5.198
2 HDPE 75 0.320
3 HDPE 90 0.441
4 HDPE 110 0.115
5 HDPE 140 0.141
HSC Connection
Sno. Total Nos.
1 376
Other Details
1.57
1.47
1.56
28-Jun-2025
29-Jun-2025