Project Completion Certificate (Ground Water)
Scheme ID: 20016081 Name of Scheme: KHAPURWA PHAKARPUR PWS No. of Villages: 1 No. of Habitation Covered: 6
Total Population Covered: 5301 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2025 Actual Date of Completion (Capex): 18-Oct-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 24/268.5 KHAPURWA 27.390045 81.549895
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT Pump 45/39 KHAPURWA 27.390045 81.549895
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 225/16 KHAPURWA 27.390164 81.549779
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 RISING MAIN/DI-K7 150 0.027
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6; Class PE-100 63 13.36
2 HDPE Pipe PN-6; Class PE-100 75 0.475
3 HDPE Pipe PN-6; Class PE-100 90 0.709
4 HDPE Pipe PN-6; Class PE-100 125 1.101
5 HDPE Pipe PN-6; Class PE-100 140 0.416
6 HDPE Pipe PN-6; Class PE-100 160 1.442
7 HDPE Pipe PN-6; Class PE-100 180 1.124
8 HDPE Pipe PN-6; Class PE-100 200 0.048
HSC Connection
Sno. Total Nos.
1 516
Other Details
2.82
2.67
2.61
14-Sep-2024
18-Oct-2025