Project Completion Certificate (Ground Water)
Scheme ID: 20016377 Name of Scheme: HARHARPUR SIMRA No. of Villages: 3 No. of Habitation Covered: 3
Total Population Covered: 2270 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 01-Dec-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 20.98/78.45 HARHARPUR SIMRA 28.198935 79.680731
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VP PUMP -1 28.80 M3 / 43 M HARHARPUR SIMRA 28.198935 79.680731
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT -1 150 KL-12 M HARHARPUR SIMRA 28.19892 79.680857
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7 125 0.030
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE / 6Kg 63 4.632
2 HDPE / 6Kg 75 0.262
3 HDPE / 6Kg 90 0.032
4 HDPE / 6Kg 110 1.468
5 HDPE / 6Kg 140 0.162
HSC Connection
Sno. Total Nos.
1 442
Other Details
2.07
0.00
1.86
01-Mar-2024
06-Dec-2024