Project Completion Certificate (Ground Water)
Scheme ID: 20016395 Name of Scheme: Udaipur water supply scheme No. of Villages: 2 No. of Habitation Covered: 5
Total Population Covered: 1627 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 30-Dec-2024 Actual Date of Completion (Capex): 06-Feb-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well 15.3/127.29 Udaipur 27.442281 82.096699
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 20.4/37 Udaipur 27.442281 82.096699
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 100/10 Udaipur 27.442281 82.096699
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-7 100 0.03
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 140 mm dia HDPE Pipe PN 6: Class PE 100 140 0.501
2 110 mm dia HDPE Pipe PN 6: Class PE 100 110 0.102
3 90 mm dia HDPE Pipe PN 6: Class PE 100 90 0.409
4 75 mm dia HDPE Pipe PN 6: Class PE 100 75 1.150
5 63 mm dia HDPE Pipe PN 6: Class PE 100 63 8.163
HSC Connection
Sno. Total Nos.
1 261
Other Details
1.73
0.00
2.14
06-May-2024
07-May-2024