Project Completion Certificate (Ground Water)
Scheme ID: 20016415 Name of Scheme: NAGLA PIPERIA No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 2770 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 30-Sep-2023 Actual Date of Completion (Capex): 31-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 22/106.41 NAGLA PIPERIA 27.636337 79.613073
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT PUMP -1 33.48/45 NAGLA PIPERIA 27.636337 79.613073
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT - 1 175/16 NAGLA PIPERIA 27.636399 79.612873
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7 125 0.030
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE / 6KG 63 6.013
2 HDPE / 6KG 75 1.244
3 HDPE / 6KG 90 0.266
4 HDPE / 6KG 110 0.915
5 HDPE / 6KG 140 1.148
6 HDPE / 6KG 160 0.162
HSC Connection
Sno. Total Nos.
1 476
Other Details
2.10
0.00
2.10
30-Dec-2023
06-Dec-2024