Project Completion Certificate (Ground Water)
Scheme ID: 20016453 Name of Scheme: MIRZAPUR DAXINI No. of Villages: 2 No. of Habitation Covered: 4
Total Population Covered: 2038 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 09-Aug-2023 Actual Date of Completion (Capex): 22-Aug-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 24.04 / 104.9 Mirzapur Daxini 27.34657 80.67863
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT Pump 500 LPM / 44 Mtr. Mirzapur Daxini 27.34657 80.67863
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 150 KL / 14 Mtr. Mirzapur Daxini 27.34657 80.67863
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. Pipe 100 0.025
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 3.223
2 HDPE 90 0.805
3 HDPE 110 1.170
4 HDPE 140 0.3231
5 HDPE 160 0.6097
6 HDPE 200 0.442
HSC Connection
Sno. Total Nos.
1 410
Other Details
1.88
0.00
1.95
09-Nov-2024
16-Jan-2025