Project Completion Certificate (Ground Water)
Scheme ID: 20016486 Name of Scheme: Antora No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 2540 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 26-Jul-2023 Actual Date of Completion (Capex): 31-Mar-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewells 35.07Mtr/ 111.1Mtr Antora 27.616749 80.077931
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 0.6 M³ per Min /45Mtr Antora 27.616749 80.077931
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 175KL/ 16Mtr Antora 27.616765 80.077679
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I Pipe 150 0.02009
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6, Class PE-100 63 3.037
2 HDPE Pipe PN-6, Class PE-100 75 2.325
3 HDPE Pipe PN-6, Class PE-100 90 0.695
4 HDPE Pipe PN-6, Class PE-100 110 0.271
5 HDPE Pipe PN-6, Class PE-100 125 0.065
6 HDPE Pipe PN-6, Class PE-100 140 2.383
HSC Connection
Sno. Total Nos.
1 214
Other Details
2.24
0.00
2.00
30-Jun-2023
25-Dec-2024