| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20016572 | Name of Scheme: KUMHRUA | No. of Villages: 3 | No. of Habitation Covered: 4 |
| Total Population Covered: 2720 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 31-Dec-2024 | Actual Date of Completion (Capex): 04-Jan-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 18.06/96.55 | KUMHRUA | 27.702314 | 79.733666 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | VT PUMP -1 | 33.12 M3 / 45 M | KUMHRUA | 27.702314 | 79.733666 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT - 1 | 150 KL - 16 M | KUMHRUA | 27.702354 | 79.733698 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI - K7 | 125 | 0.020 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE/6KG | 63 | 3.533 | |
| 2 | HDPE/6KG | 75 | 1.696 | |
| 3 | HDPE/6KG | 90 | 1.080 | |
| 4 | HDPE/6KG | 110 | 0.375 | |
| 5 | HDPE/6KG | 140 | 1.683 | |
| 6 | HDPE/6KG | 160 | 0.175 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 553 |