Project Completion Certificate (Ground Water)
Scheme ID: 20016627 Name of Scheme: Ukani Viram Rai WS No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 3667 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 31-Dec-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 200mm X 150mm 30.08m/144.01m Ukani viram Rai T.W-1 25.370008 83.303547
2 200mm X 150mm 29.96m/139.87m Ukani viram Rai T.W-2 25.374279 83.30305
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Borewell Pump 0.370(cum)/56(m) Ukani viram Rai T.W-1 25.370008 83.303547
2 Submersible Borewell Pump 0.370(cum)/56(m) Ukani viram Rai T.W-2 25.374279 83.303547
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OVERHEAD TANK 300(KL)/12(M) Ukani viram Rai T.W-1 25.374293 83.303179
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI-KP 80 0.930 From (T.W-1 and T.W-2) to ESR
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 6.67
2 HDPE 75 0.733
3 HDPE 90 1.10
4 HDPE 110 0.328
5 HDPE 140 0.738
6 HDPE 160 0.372
7 DI-K9 200 0.098
HSC Connection
Sno. Total Nos.
1 582
Other Details
4.06
4.06
4.26
07-May-2025
06-Aug-2025